The smallest pour on the property and the one with the most decisions attached, nearly all of which have to be made before anybody mixes anything.
A pad is a rectangle of concrete and it is deceptively easy to get wrong, because almost everything that determines whether it works gets decided before the pour. Where it sits, what runs under it, how big it is and how water leaves it are all effectively permanent once it is down, and none of them is a concrete question.
Settle the position first
Not where you picture it. Where it is allowed to be, and where it will still make sense in ten years.
Setbacks come first, because a municipality can have views about how close a structure sits to a boundary, and that can move a pad several feet from where you had imagined it. Ask the Village before ordering a shed rather than after, since a delivered building and a pad in the wrong place is an expensive combination.
Then look at the ground. Where does water go when it rains hard. A pad placed at the bottom of a fall becomes an island in the wet season, and a shed at that spot has a damp floor forever. Access matters too: getting concrete to the back of a garden is a real constraint, and where a barrow route has to cross a lawn it is worth knowing in advance.
And think about what crosses the ground. Anything buried under a pad is under it permanently. Drainage runs, irrigation, a future cable to the back of the garden. This is the single most common regret we hear, and it costs nothing to think about beforehand.
Shed pads
The base carries the job here. A shed is light, so nobody is worried about the slab breaking; the risk is the whole thing settling unevenly, after which the doors stop closing. Doors sticking is the classic sign of a pad that was poured on material nobody compacted properly.
Size is a real decision rather than a default. Matching the footprint exactly keeps the timber base off the soil and looks tidy. Extending the pad past the doors gives you somewhere dry to stand while you find things, which anyone who uses a shed in February will appreciate. The one arrangement to avoid is a pad slightly bigger all the way round, which just collects leaves against the walls.
Falls matter more than people expect. A pad that is dead level holds water against the shed base. A very slight fall away from the doors takes it somewhere else and costs nothing to build in.
Hot tub pads
Different problem entirely. A shed is light and forgiving; a filled tub with people in it is heavy, concentrated and unforgiving about settlement, because the water inside it shows you immediately if the thing is not level.
So here the specification is not ours to choose. The manufacturer publishes what the pad has to be for that model, and that figure accounts for the loaded weight and how it is carried. We pour to it. What we will not do is put a thickness on a web page, because a number invented here would be a guess about something people sit in, and the real one is in the documentation that came with the tub.
Get that paperwork before anybody quotes. It is a two-minute job that prevents the worst version of this project.
The other thing to settle early is services. A tub needs power and often wants a route for it, and running that before the pad is poured is trivial while running it afterwards is not. An electrician should be in the conversation at design stage rather than on delivery day.
Frost, and why a pad is not a footing
A pad by itself is flatwork, which means it rides on compacted fill rather than being founded in anything. Slight seasonal movement is what it is built to accommodate, not something it is supposed to fight. It has no business going anywhere near the frost line, and nobody should be excavating four feet to stand a shed on.
Where an outbuilding is substantial enough that the structure needs founding, that is a different piece of work with a footing in it, and it is worth establishing which category you are in before a design exists. The distinction, and what the county frost figure actually governs, is in frost depth and flatwork.
Where our work stops
We pour the pad. We do not erect the shed, assemble the building, wire the tub or connect anything to it.
That is a deliberate boundary rather than a shortfall. A crew that pours flatwork every day is good at flatwork, and an electrician should do the electrical work. What it means practically is that a pad project has two or three trades in it, and sequencing them, particularly getting anything that must run underneath in place first, is the part worth planning.
Larger flat areas, and the same decisions at patio scale, are on our concrete patio page. What a slab costs across the various use cases is in what a concrete slab costs.